FY-200 multifunctional crawler properly drill is a new,very-efficient ,energy-conserving and multifunctional hydraulic drill and it is specialised in drilling nicely ,checking well, geothermal air-conditioning hole,grouting hole of the hydropower cofferdam ,grouting gap for dyke seepage control and grouting gap for base enforcement ,area mining ,anchorage .countrywide protection venture and other drilling operationsThe drill rig is geared up with hydraulic motor rotation with a substantial electricity,propulsion and lifting of cylinder and down-hole impacter with higher blast pressure,to realize higher effectiveness of drilling footage and reduced energy intake.
Features:
1, The motor using Yuchai 65KW turbocharged diesel motor
2, Going for walks products: going for walks motor with gear box, long functioning life
3, The hydraulic pump: parallel gearbox layout (patent) different pump, the power to offer sufficient distribution, unique hydraulic method style, servicing is easy with decrease charges
4, The power head system: gearbox casting, double motor to offer power, large torque, durability, routine maintenance value is reduced
five, Rig chassis: expert digging equipment chassis, sturdy, massive bearing capacity, vast chain plate, which has modest injury to the hard road
6, The lifting pressure: patented design and style compound arm, arm in small measurement, prolonged stroke, double-cylinder update, lifting with large tonnage
seven, Lifting arms of every single rig are installed limiter to shield the cylinder protection cylinder and to shield the stability of the function procedure
8, Every of the hydraulic oil tube are wrapped with protecting jacket, which make the oil tubes have a for a longer time services time.
CZPT motor to provide power, large torque, durability, maintenance cost is lower.
The welding device can be geared up on the rig, which is utilized to weld the solitary use casing tubes during drilling.
CZPT parameters:
FY-200 Multi-function crawler hydraulic water properly drilling rig specialized figures | |
Drilling depth | 200m |
Drilling diameter | Φ140-Φ305mm |
Doing work air strain | one.7-three.0MPa |
Air use | seventeen-30m3/min |
Drilling pipe diameter | Φ76, Φ89mm, Φ102mm |
Size of drill pipe | 1.5m, 2.0m, 3.0m |
A single drive duration | 3.4m |
Tramming speed | two.5km/h |
Climbing potential (Max.) | 30° |
Floor clearance (Min.) | 250mm |
Rotation pace | 50-70 rpm |
Rotation torque | 4800-6500 N.m |
Electrical power | sixty five Kw |
Bodyweight | five.8T |
Dimension | 4000x1750x2450mm |
Packaging & Delivery: